Underground and Ventilation System - Waste Isolation Pilot Plant

Underground and Ventilation System - Waste Isolation Pilot Plant

WIPP CAPACITY National Academy of Sciences Todd Shrader Carlsbad Field Office June 26, 2018 www.energy.gov/EM 1 WIPP Statutory Capacity The WIPP Land Withdrawal Act (LWA), Public Law 102-579, authorizes WIPP for disposal of up to 175,565 cubic meters (6.2 million cubic feet) of transuranic (TRU) waste. Up to 7,079 cubic meters (250,000 cubic feet) of TRU waste can be remote handled DOE 1981 & 1998 ROD, and 1997 SEIS-II. Drums and boxes assumed to be full, based on inventory estimates from late 1970s & early 1980.

Although recognized as a possibility, overpack was not assumed. Volume was based on original 1980 assumptions of TRU waste in interim storage in Idaho, an enduring mission at Rocky Flats and continued plutonium missions at Hanford and Savannah River. There is no specific disposal configuration specified in the LWA other than the requirement to stay within the 16 square mile land withdrawal boundary. LWA Sec. 7(3) CAPACITY OF WIPP. The total capacity of WIPP by volume is 6.2 million cubic feet of transuranic waste. As of June, 2018 93,500 cubic meters of TRU waste emplaced in WIPP. www.energy.gov/EM 2 WIPP Statutory Capacity Less than one square mile at a single horizon has been used thus far. www.energy.gov/EM 3 Panel Regulatory Capacity

For operational efficiencies, WIPP handles all TRU waste as mixed TRU waste Each Hazardous Waste Disposal Unit (Panel 1-8) was permitted for 18,000-19,400 cubic meters of TRU mixed waste. Panel 9 not planned for disposal. Panel 10 may be used but must be permitted by the state for use. Per the WIPP Hazardous Waste Facility Permit, The maximum repository capacity of 6.2 million cubic feet of transuranic waste is specified in the WIPP Land Withdrawal Act (Pub. L. 102-579, as amended) It is estimated that after Panel 8 is filled, the emplaced WIPP repository volume will be 115,000 to 120,000 cubic meters. www.energy.gov/EM 4 WIPP Volume Capacity--Current and Projected Volumes TRU Waste Inventories TRU Waste Already Emplaced at WIPP "WIPP-Bound" Best Estimates ** SubTotal: Already Emplaced + WIPP-Bound UNSUBSCRIBED CAPACITY Current Permit

Calculates Volume of Outer Container Cubic meters (m3) 93,500 ~78K Permit Modification-Changes Volume of Record to Inner Container (m3) Notes ~-30% WDS data through mid-June ~-15% Data cutoff 12/31/16; Includes 6 metric tons (MT) of surplus Pu~5K m3; Source: DOE/TRU-17-3425 ~172K ~4K "Potential Inventory" Estimates** ~19K Total Emplaced, WIPP-Bound, and

Potential Waste** ~191K >40K Volume below WIPP LWA Limit of 175,565 m3 Data cutoff 12/31/16; Source: DOE/TRU-17-3425 ~150K 191K 40K = ~150K ** Estimates will vary as estimates are updated and waste is packaged. Definitions: WIPP-Bound this is waste already in storage or projected to be generated in the future and is expected to meet the WIPP waste acceptance criteria, currently totaling approximately 78,000 m 3; Potential Waste this is waste that may be intended for WIPP but requires resolution of a regulatory or other constraint before it may be considered, currently totaling approximately 19,000 m 3; and www.energy.gov/EM 5 WIPP Volume of Record

Volume of Record to track compliance with this limit has generally been determined by using the outer container volume for CH-TRU waste. Because many drums are overpacked in larger containers, using the outer container volume counts a significant amount of void space as waste. DOE/CBFO proposes to change the calculation method so the Volume of Record better reflects the volume of waste disposed. For tracking the TRU waste volume with WIPP LWA capacity limit the new methodology will count the volume of the inner container in cases where CH TRU waste is overpacked. The waste volume of direct loaded containers will continue to be the outer container. For compliance with the RCRA Hazardous Waste Facility Permit, the outer container is proposed. Under the new methodology, the calculated volume of waste already emplaced is reduced by about 30%, and future WIPP-bound waste by 15%. www.energy.gov/EM 6 VOR Permit Modification Request Process NMED determined the PMR will follow the Class 3 PMR procedures,

which consists of the following major steps; NMED will likely provide a Technical Incompleteness Determination (TID). WIPP responds to the TID. NMED prepares a draft Permit. Minimum 45-day public comment period on the draft Permit. May include Negotiation. May include an administrative Hearing. Findings of Facts and Conclusion of Law produced. Hearing Officer prepares a report NMED Secretary final decision on PMR. Submittal of a Planned Change Notice to EPA is performed in parallel. www.energy.gov/EM 7 Additional Disposal Panels at WIPP

Conceptual repository design for additional disposal panels being prepared. NEPA analysis of the potential environmental consequences from the proposed action associated with adding disposal panels to meet the LWA Capacity limit, increase in operational time frame, and a revised final WIPP facility closure date. Permit Modification Request to NMED for construction and use of additional disposal panels. Planned Change Request to EPA demonstrating WIPP continues to comply with long-term radioactive waste standards with the new repository design Excavate access drifts and additional disposal panels. www.energy.gov/EM 8

Recently Viewed Presentations

  • NAPW 2012 - integralballet.com

    NAPW 2012 - integralballet.com

    The Difference. The environment must be conducive for those students that do want the rigorous structure of professional-track ballet training without taking away from the attention given to, or the experience of, the recreational dancers.
  • Spelling Instruction and Assessment in the 21st Century

    Spelling Instruction and Assessment in the 21st Century

    The study of spelling and how letters combine to make sounds and words. English is far more regular than it appears on the surface---Scripps Spelling Bee scholars as an example. Once teachers have a clear understanding of student's orthographic knowledge...
  • Evolution - Coventry Schools

    Evolution - Coventry Schools

    Evolution of living things. Evolution - when a species of plants or animals adapts to their environment in order to survive over a long period of time. Key points! Species. Plants or Animals. Adaptations. In order to survive. Long period...
  • Required rate of return  When valuing assets and

    Required rate of return When valuing assets and

    Firm-specific risk . Also called idiosyncratic risk, asset-specific risk, diversifiable risk. Risk that affects one or a few investments. Can be diversified away so that investors are not rewarded for bearing this risk. Market risk .
  • To Presenters: How to Use This Presentation Delete This Page ...

    To Presenters: How to Use This Presentation Delete This Page ...

    Examples of how IBM text analytics technologies optimized operations or realize new insight for organizations. Kraft Australia used GBS CORBA text analytics - a few years ago - for a successful launch of Vegemite product. (not the failed iSmart launch...
  • Expressed sequence tags - biology.unm.edu

    Expressed sequence tags - biology.unm.edu

    JOHN MCCREADY. BIOL 446L. background. Late 80's: GenBank estimates it will take 10-12 years to sequence the ~3 billion bp human genome. Roughly 3% of the DNA are coding sequences for genes. Complete DNA sequencing is expensive and time consuming.
  • THE PURITANS - Polson High School

    THE PURITANS - Polson High School

    Basic Puritan Beliefs. Original Sin. Everyone was born sinful because of Adam and Eve's fall. God's will is all. Guides and controls the universe
  • Title

    Title

    Small group, problem-based learning (similar to McMaster Medical School) but a . more. guided-discovery method (initially not self-directed) Mentor model with research project is possible (even as a second course); could be a self-study program-text (vs. typical texts) Strategy