March 2002 doc.: IEEE 802.15-02/160r0 Project: IEEE P802.15

March 2002 doc.: IEEE 802.15-02/160r0 Project: IEEE P802.15

March 2002 doc.: IEEE 802.15-02/160r0 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: St. Louis 802.11e/802.15 Liaison Report. Date Submitted: 15 March, 2002 Source: Jay Bain Company: Time Domain Address: 7057 Old Madison Pike Voice: 256 922 9229 , FAX: 256 922 0853, E-Mail: [email protected] Abstract: Purpose: For information Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15 Submissio n Slide 1

Jay Bain, Time Domain March 2002 doc.: IEEE 802.15-02/160r0 St. Louis 802.11e/802.15 Liaison Report Submissio n Slide 2 Jay Bain, Time Domain March 2002 doc.: IEEE 802.15-02/160r0 Entering the Dallas meeting TGe completed letter ballot 30 of draft 2.0 on 16 January 2002 Ballot failed to have 75 % approval from the letter ballot 55% 2014 comments of which 750 are editorial

Submissio n Slide 3 Jay Bain, Time Domain March 2002 doc.: IEEE 802.15-02/160r0 Project Directions TG agreed to continue with ballot resolution at the May meeting Recirculation or new ballot not yet determined. Task group will run conference calls between March and May meetings Broken into several sub areas for calls Submissio n Slide 4 Jay Bain, Time Domain March 2002

doc.: IEEE 802.15-02/160r0 Technical resolution areas of St. Louis Plenary meeting Burst ACKs complete AP mobility complete HCF rules MAC frames FEC Other See doc 084r9 for summary Submissio n Slide 5 Jay Bain, Time Domain

March 2002 doc.: IEEE 802.15-02/160r0 Status from doc 084r9 800 750 700 650 600 550 500 450 400 350 300 Comments Remaining 250 200 150 Comments Resolved

100 Submissio n Slide 6 U nassigned C om bined* F ram e F m ts OB S S A P Mobility B urst A ck FEC Other HCF 0

T Ge E ditor 50 Jay Bain, Time Domain March 2002 doc.: IEEE 802.15-02/160r0 Exiting the March meeting Down to 1168 comments of which 658 are editorial Continue ad-hoc teleconferences between March and May Continue comment resolution in May Submissio n Slide 7 Jay Bain, Time Domain

Recently Viewed Presentations

  • Microbiota do corpo humano human Leonardo Sokolnik de

    Microbiota do corpo humano human Leonardo Sokolnik de

    Transplante de microbiota intestinal Estratégia para curar pacientes com diarréia crônica devido à infecção por Clostridium difficile após uso de terapia antimicrobiana. Microbiota intestinal e diabetes A presença de grande quantidade de bactérias Firmicutes aumenta a absorção de nutrientes e...
  • Inclusion in Society A University Contribution

    Inclusion in Society A University Contribution

    Aims: To understand the activities, evidence base, knowledge and skills required to perform the external examiner role . To consider a range of external examiner scenarios
  • The Capital Asset Pricing Model - Economics Network

    The Capital Asset Pricing Model - Economics Network

    The Capital Asset Pricing Model CAPM ... The CML is also tangent to frontier at M. So: Security Market Line β E(Rp) SML Rf 1 E(Rm) Interpreting Beta Beta The numerator represents the systematic risk of asset A The denominator...
  • http://www.bized.co.uk The Marketing Mix Copyright 2006  Biz/ed http://www.bized.co.uk

    http://www.bized.co.uk The Marketing Mix Copyright 2006 Biz/ed http://www.bized.co.uk

    The Marketing Mix The Marketing Mix The tools available to a business to gain the reaction it is seeking from its target market in relation to its marketing objectives 7Ps - Price, Product, Promotion, Place, People, Process, Physical Environment Traditional...
  • CEO Council Meeting

    CEO Council Meeting

    Investment in next generation networks A competitive approach to stimulating Europe's broadband future - CEPS 22 February 2007
  • Hospital Service Accountability Agreements: Schedules & Indicators Fiscal

    Hospital Service Accountability Agreements: Schedules & Indicators Fiscal

    HSAA Organizational StructureCreating an ownership framework . The HSAA Indicators Work Group is co-led by Mark Brintnell, Senior Director, South West LHIN, and Imtiaz Daniel, Director, Financial Analytics and System Performance, Ontario Hospital Association.
  • Tapyba - WordPress.com

    Tapyba - WordPress.com

    Kautynės. Siužetinis piešinys iš Morella la Vella Ispanijoje. 8000-5000 m. pr. Kr. Egipto tapyboje susiformuoja pirmasis tapybos kanonas - tiek žmogų, tiek daiktus vaizduoti iš atpažįstamiausio rakurso. Hesyro portretas, XXVIII a. pab. - XXVII a. pr. prieš Kr.
  • Welcome to USD - University of San Diego

    Welcome to USD - University of San Diego

    (18-19) The previous passage used words that were not the author's and did not put them in quotation marks. Rule 2: Always paraphrase by thoroughly reshaping the original in accordance with your own vocabulary, syntax, and sentence rhythm. Paraphrases require...