Africa Programs Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou Mali
Weather radar and project locations Radar locations Burkina Faso and Mali radar locations. Local weather services and universities Radar pictures of West African squall line
Real-time data Bamako, Mali http://www.rap.ucar.edu/projects/westafrica/ bamakoradardata/images/BamakoDbz/ CP_BamakoDbz_BAMAKO_20061003163600.png Recent Work
Unstable and unreliable internet and local area network at the Programme SAAGA offices in Ouagadougou. The network and internet connections went down several times during the day and once for a period of 24 hours. The problems were associated with wiring problems, router and firewall problems and not necessarily with the internet connection as such. The network and internet connections in Bobo Dialloso were found to be highly reliable and
working fine. The problems in Ouagadougou could also be associated with frequent power outages at the Programme SAAGA office during my one-week stay. Unstable power supply and frequent power outages at the Programme SAAGA offices in Ouagadougou. Although a standby generator is available for power supply when normal electrical power outages occur it always took 30 seconds to a minute to change from normal to standby power. The UPS units that supply power to the radar and TITAN/CIDD computers during this transition are small and on days when several of these power outages occurred the UPS
batteries were drained and were not able to continue to provide power to the computers and equipment. This resulted in systems losing power and rebooting after power was reinstated. This also resulted in loss of data. Africa Initiative Proposal Activities Finalize implementation of radars and software (Current funding) Provide expert in networking to evaluate and
help design reliable network (New funding, travel and support, 1 month) Network Mali and Burkina Faso radars and potentially MIT Niger radar (new funding, software engineer, 1month) Stream data to UNIDATA (new funding, 1 month per year software engineer, UNIDATA) Proposal Activities (cont.)
Burkina Faso has recently purchased two EEC C-band radars. As part of a sub-contract with EEC, NCAR is already working with Burkina Faso to provide upgraded software for one of the radars. Propose to upgrade the two C-band weather radars by providing a new receiver with Doppler capability including analysis software (1 month radar engineer, 1 month software engineer, hardware (~50k). Education and training (3 people from Burkina Faso and
Mali will visit NCAR for training, current funding; GLOBE, COMET, UCAR E&O, START, ASMET, etc?) Workshop in Fall or early winter in West Africa (Sahel other west African countries using existing networks).
We inspire our students to reach their academic potential. ... IPC 11 will be scheduled for two consecutive blocks. Allows for greater flexibility. More in-depth investigations through experimentation and projects. Highly interactive and active learning, group discussion and collaborative ...
Arms Control, Disarmament, and International Security (ACDIS) at UIUC ... United States, on Japan, WWII Hiroshima (August 6, 1945) and Nagasaki (August 9, 1945) Fat Man and Little Boy Estimated that between 115,000-170,000 were killed immediately Twice as many more...
MSW Degree with 2 years post-MSW social work experience or BSW Degree with 5 years post experience. LCSW preferred but not mandatory. Attend 16-hour supervisory course . Task Supervisor. Agency staff member assigned to supervise specific learning tasks given to...
SCRs with additional information Scenario 1: supporting end of life care Professor Bee Wee NHS England Director for End of Life Care * The SCR provides the end of life preferences entered in the GP practice system - complementing local...
Mission of the Twelve to England. ... Van Buren was small and dapper, well-dressed and courtly in manner. Though liked by almost everyone who knew him personally, he failed to win over Joseph. ... "Today I stood upon my feet...
Similarities in English Focus is closely similar to "stress" in English. In Tagalog, words in focus is marked with ang, ang mga, si, sina or if pronouns are used, ang pronouns. Verbal Focus the relationship between the verbal affixes and...
Reflexive constructions in Spanish are generally used to describe actions that people do to, or for, themselves:Notice that we often indicate that a verb is reflexive by attaching se onto the infinitive Acostarse (ue) To lay one's self down (to...
She had an absent tooth. Dear Teacher: The basement of our house got flooded where the children slept so they had to be evaporated Dear Teacher: I am sorry Cathy was not at school on Friday as it was my...
Download Presentation
Ready to download the document? Go ahead and hit continue!