106.359. Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities. Overview MSS Schedule in 30 TAC 101.222(h) January 5, 2012 SB 1134 moved the deadline for Oil and Gas to January 5, 2014 Must meet 30 TAC 106.4 PBR 106.359 (1) engine, compressor, turbine, and other combustion facilities

maintenance; (2) repair, adjustment, calibration, lubrication, and cleaning of site process equipment; (3) replacement of piping components, pneumatic controllers, boiler refractories, wet and dry seals, meters, instruments, analyzers, screens, and filters; (4) turbine or engine component swaps; (5) piping used to bypass a facility during maintenance; (6) planned MSS activities with the same character and quantity of emissions as those listed in paragraphs(1-5) of this subsection;

PBR 106.359 (7) pigging and purging of piping; (8) blowdowns; (9) emptying, purging, degassing, or refilling of process equipment, storage tanks and vessels (except landing floating roof tanks for convenience purposes), if subparagraphs (A) - (C) of this paragraph are met. (10) abrasive blasting, surface preparation, and surface coating of facilities and structures used at the site in oil and gas handling and production. MSS PBR Timeline March 15-April 15,

2013 Comment Period July 26, 2013 Adoption September 10, 2013 Effective Date January 5, 2014 O&G Authorizes Planned MSS MSS Authorization Options 106.352 (i)-Planned Maintenance, Startups and Shutdowns Options:

Counties required to be registered under 106.352(a-k) must use (i) Counties voluntarily registered under 106.352(a-k) have an option to revise to 106.352 (l). Registering/Representing MSS-January 5, 2014 106.359-Planned MSS at O&G Handling & Production Facilities

Applicability No superseding of existing authorization Planned MSS Activities PBR does not require registration Best management practices Keep records 106.359 Construction Authorizations (Title V, NSR, Standard Permit) Title V 106.359 required for permit

Minor revision OP-NOTIFY NSR (New Source Review) 106.359 used to increase specific activities Activities must be in compliance with rules 106.359 may not be used to remove existing special conditions Standard Permits 106.359 not incorporated 116.620 Referenced at renewal No hourly emission requirements

MSS Options-Barnett Shale 30 TAC 106.352(a)-(k) Authorized under 106.352(i) Painting and Blasting authorized under 106.263 Non-Rule Standard Permit Authorized under Section (i) Painting and Blasting authorized under 106.263 Barnett Shale Counties What is the difference between Scheduled Maintenance, Planned Maintenance, and Upsets? What is the difference between Scheduled Maintenance, Planned

Maintenance, and Upsets? Scheduled maintenance, startup, or shutdown activities are routine and predictable and are scheduled using time constraints. These activities should be included in the companys maintenance program. What is the difference between Scheduled Maintenance, Planned Maintenance, and Upsets? Engine oil will be changed every three months.

Planned activities are routine and predictable, similar to scheduled maintenance, but planned maintenance is not necessarily scheduled for a specific date in the future. For example: The brake pads on the car will be changed when the thickness is less than 1/8 inch. What is the difference between Scheduled Maintenance, Planned Maintenance, and Upsets? What is the difference between Scheduled Maintenance, Planned Maintenance, and Upsets?

Planned maintenance can be performed on an accelerated timeframe when a facility is shut down due to an emissions event. For What example: is the difference between Scheduled Maintenance, Planned Maintenance, and Emission event causesUpsets? the engine shut down. While engine is down, planned maintenance is performed. Emissions during maintenance and

the subsequent startup of the facility may be claimed as planned maintenance. Emissions from the initial emission event that caused the engine shutdown cannot be claimed as planned maintenance Unplanned and unavoidable This PBR does not authorize emissions associated with emissions events, malfunctions, upsets, unplanned startup, unplanned shutdown, or unplanned maintenance activities that require immediate

corrective action. What is the difference between Scheduled Maintenance, Planned Maintenance, and Upsets? MSS Examples Lily Site Compressor Gas Gas Sales

Separator om c In ing ct u od r P

Flare VRU Crude Tank 1 Tank 2 Crude Pipeline Closed

Compressor for Repairs Sales Gas Best management practice would be to route the emissions to the flare as a control, if the control can handle the gas and if it can

be routed to the flare. Separator om c In ing ct u od

r P Crude Tank 1 VRU Flare Gas to atmosphere MSS Example 1

Tank 2 Crude Pipeline MSS Example 2 Compressor Closed for Repairs VRU Gas Separator

om c In ing ct u od r P Crude

Tank 1 Tank 2 Crude Pipeline Flare Gas Gas Sales

MSS Example 3 Compressor Gas Gas Sales Separator om c

In ing ct u od r P Crude Tank 1

Closed for sing s a Tank 2 Deg Repairs Crude Pipeline Flare VRU

Summary Compressor Gas Gas Sales Separator om c In

ing ct u od r P Flare VRU Crude

Tank 1 Tank 2 Crude Pipeline Calculation of Emissions from MSS Activities at Oil & Gas Production Facilities Calculation Programs TCEQ is aware of two programs that can do MSS emissions calculations.

TCEQ Oil and Gas Emissions Calculations Spreadsheets Tanks ESP MSS Default Values for Miscellaneous Activities Spreadsheet contains the default value of a total of 0.25 tons per year for all activities authorized by 106.359(b)(1)- 106.359(b)(6). No calculations necessary! The spreadsheet also allows more customized estimates of emissions for applicants choosing not to

accept default values. MSS Default Values for Miscellaneous Activities The emissions in activities (b)(1)-(b)(6) may seem small, but they do add up over time. All default values are conservative. Ex: (b)(1) Engine Oil changes / Filter changes. -Number of activities per year is 10 (Number of oil changes per engine per year) -Number of Engines is set at 10 -Allows for 100 oil changes per year

MSS Default Values for Miscellaneous Activities Customization of the default spreadsheet is possible. Ex: A Glycol Dehydration and Amine unit are not present. -Emissions not used for these Units can be used for other activities. MSS Default Values for Miscellaneous Activities Best option? Use the default values.

It is as easy as selecting Yes at the top of the Spreadsheet page. MSS Default Values for Miscellaneous Activities Can help with record keeping Equations located at the bottom of the spreadsheet page. TCEQ Oil and Gas Emissions Calculations Spreadsheet Blowdowns MSS pigging MSS Floating Roof Tank Landing Losses MSS Tank Non Forced Ventilation Degassing

MSS Tank Forced Ventilation Degassing http://www.tceq.texas.gov/assets/public/permitting/air/ NewSourceReview/oilgas/spreadsheet-revisions.pdf Equations: Located on bottom of each Spreadsheet Blowdowns and MSS Pigging and Piping Components: -Emission estimates based on Ideal Gas Law PV=nRT. -VOC result = ((Pressure of Gas Inside the Unit Before Venting) * (Actual Volume of the Vented Unit)) / (Frequency of events) * (Molecular Weight) * VOC wt%

Engine Oil change/Filter change Two components to Emissions: -Losses from emptying of oil into an open pan can be estimated using AP-42 Loading Equation: -Evaporation Losses from open pan:MW0.67 Ap0.94 t Changing Solution in Glycol Dehydration Units and Amine Units -AP-42 Loading Equation: -AP-42 Clingage Loss Equation:

Equations: Located on bottom of each Spreadsheet Changing Engine Rod Packings and Wet/Dry Seals and Heater Treaters: -Emissions result from the evaporation of the lubricant adhered to the rod packing and seal casings. -AP-42 clingage equation: Aerosol Lubricants: Emissions from the use of aerosol lubricants such as WD-40 can be estimated by assuming that 50% of the contents of a 16 oz can are volatile hydrocarbons that will volatilize.

Calibration: Emissions resulting from the use of calibration gases can be estimated by weighing the calibration gas cylinder every time it is used. Painting and Sandblasting Air Permit Technical Guidance for Coatings Sources: Surface Coating Operations. Small Business and Local Government Assistance Surface Coating Facilities: Emissions Calculation Spreadsheet http://www.tceq.texas.gov/assistance/industry/sc/coating-emissions-calc. html TCEQ Technical Guidance : Abrasive Blast Cleaning

Emissions from Aerosol Cans (paints, paint removers, rust inhibitors, etc.) Assume that 90% of the can contents evaporate Where to Find More Information Air Permits Main Line : (512) 239-1250 [email protected] www.texasoilandgashelp.org

Recently Viewed Presentations

  • CAT 2: Investigating Water Scarcity

    CAT 2: Investigating Water Scarcity

    Read the two paragraphs about economical and physical water scarcity. - Write a definition for each. - Include the examples stated. Section 1 . In your research book: Complete the shade and label task. Do not colour and label all...
  • Senior Team Mathematics Challenge

    Senior Team Mathematics Challenge

    The mathematical function is the model for the motion! How realistic is this. Fitting Functions: Tidal Flow ... (riders are arranged 2 across in 2 rows per car) Train leaves loading station every 1 minute 40 seconds ... The FMSP...
  • By Richard C. Wilson

    By Richard C. Wilson

    The EIF conducted an in-depth due diligence process, which included in-person meetings both in Luxembourg and Tel Aviv, on-site due diligence on the iAngels team and our processes, and meetings with CEOs from our portfoliocompanies ... By Richard C. Wilson...
  • BEOWULF - Ms. Shelton's Class Website

    BEOWULF - Ms. Shelton's Class Website

    BEOWULF Caesura example: Then the Scylding warrior savage and grim, Seized the ring-hilt and swung the sword Struck with fury despairing of life Thrust at the throat broke through the bone rings: The stout blade stabbed through her fated flesh.
  • KOMISI PEMBERANTASAN KORUPSI Workshop Diseminasi Pendidikan Antikorupsi di

    KOMISI PEMBERANTASAN KORUPSI Workshop Diseminasi Pendidikan Antikorupsi di

    Bribery of national public officials (penyuapanpejabatpubliknasional) Bribery of foreign public officials and officials of public international organizations
  • Age of Absolutism - World Civics

    Age of Absolutism - World Civics

    Age of Absolutism Age of Absolutism - Time period where a series of European monarchs increased the power of their central governments. Absolute monarch - Kings or queens who believed that all power within their state's boundaries rested in their...
  • FileNewTemplate - Nassau BOCES

    FileNewTemplate - Nassau BOCES

    Manage Resources and Make Student Learning More Effective Destiny® Resource Manager™ LeeAnn started with a 1:1 program and is growing the number of areas she is tracking and managing with the use of Destiny Resource Manager * * Headlines or...
  • THE UNIVERSITY OF TEXAS AT DALLAS Project/Program Management ...

    THE UNIVERSITY OF TEXAS AT DALLAS Project/Program Management ...

    CASE: Erik Peterson (A) (furnished) Erik Peterson is the general manager of GMCT. How much power does he really have? What are its sources? How effectively has he used his power? Who has real political power in this organization? Who...